Titan International
Home » Fort Cambridge

Client:

Fort Cambridge

Industry:

 


Fort Cambridge; a high-rise residential complex with an excess of three hundred and fifty apartments is the highest block of residential apartments built so far in Malta. The particular conditions of this building necessitated an infrastructure which is out of the norm for the local estate industry. Titan performed both mechanical and electrical installations for the backbone of the services and within the apartments themself. We installed also LG water-cooled VRF air-conditioning units within the apartments and the under-floor heating.

Share product: